Predictive vs preventive vs condition-based maintenance: the difference in practice

What is the difference between predictive and preventive maintenance, and between condition-based and predictive? NASA's RCM guide and two Sensors reviews side by side: what triggers the work, what data each needs, where breakdown and run-to-failure fit, and how to label work orders consistently.

Here is a situation we'll use as an illustration. It is invented, not a reported case. A plant's monthly maintenance report has three lines under "predictive and condition-based". The first is a gearbox oil change, done because the counter reached its scheduled hours; someone ticked "predictive" because the job was planned in advance. The second is the weekly walk-around of the boiler feed pumps, filed as "condition-based" because the technician looked and listened. The third is a bearing replaced after a vibration reading rose over three months. All three count towards the same figure. At month end nobody can say how much work was triggered by the calendar, how much by a measured condition and how much by a failure, so this month cannot be compared with last month, or with the plant next door.

The words are the problem, and the literature does not fully agree on them either. This post puts three sources side by side: the NASA Reliability-Centered Maintenance Guide for Facilities and Collateral Equipment (2008) and two open-access reviews in Sensors, Moleda et al. (2023) and Olesen and Shaker (2020). It sets out what triggers the work in each strategy, what data each one needs, where breakdown and run-to-failure fit, and a way to label work orders so the numbers can be compared. Every quotation is checked against the source PDF, with section and page.

Short answer: Preventive maintenance is triggered by the calendar, operating hours or cycles, and is done regardless of condition. Condition-based and predictive maintenance are triggered by measured equipment condition. Breakdown (reactive) maintenance is triggered by the failure itself. The sources differ on whether predictive maintenance is a type of condition-based maintenance or another name for it.

Applies to: Maintenance managers and plant heads who set maintenance strategy, approve task lists or read work-order and KPI reports. The NASA guide is written for facilities and their equipment; both reviews focus on power plants, and their definitions are general. Last verified: 27 Nov 2026. Author: Muhammed Fahiz

What is the difference between predictive and preventive maintenance?

The difference is what starts the job. Preventive maintenance starts because a time or usage interval has run out; predictive maintenance starts because a measurement says the equipment needs it.

The NASA guide defines preventive maintenance (PM) as "regularly scheduled inspection, adjustments, cleaning, lubrication, parts replacement, calibration, and repair of components and equipment." It schedules work "at pre-defined intervals (time, operating hours, or cycles)" and "It is performed regardless of equipment condition" (Section 5.2, p. 5-4). Moleda et al. describe the same idea for power plants: "scheduled periodic inspections and replacements", with typical tasks that "include lubrication, adjustments, oil changes or advanced diagnostics", and intervals planned from manufacturer recommendations or from MTBF and MTTF (Section 2.2, pp. 6-7). Olesen and Shaker put it in one line: preventive maintenance "deploys maintenance based on a time or cycle metric", as with a car serviced after a set distance (Section 1, pp. 1-2).

Predictive maintenance replaces the interval with a measurement. NASA calls it Predictive Testing and Inspection (PT&I), "also known as predictive maintenance or condition monitoring", and says it "replaces arbitrarily timed maintenance tasks with maintenance that is scheduled only when warranted by equipment condition" (Section 5.3, p. 5-7). In Moleda et al., the servicing "is carried out when it is required, usually shortly before a fault is expected" (Section 2.3, p. 7). Olesen and Shaker quote Mobley's definition, in which a predictive programme uses tools such as vibration monitoring, thermography and tribology to obtain "the actual operating condition of critical plant systems and based on this actual data schedules all maintenance activities on an as-needed basis" (Section 2.1, p. 4).

The sources also say where each one falls short. On PM, NASA notes that "The majority of equipment is not subject to wear-out" and that "Timed maintenance can often result in unnecessary and in some cases harmful maintenance" (Section 5.2, p. 5-5). Olesen and Shaker say that with preventive maintenance "asset operators do not know whether the maintenance is deployed efficiently" (Section 1, p. 2). On predictive maintenance, NASA says PT&I "does not lend itself to all types of equipment or possible failure modes and therefore should not be the sole type of maintenance practiced" (Section 5.3, p. 5-8).

What is condition-based vs predictive maintenance?

The three sources answer this differently, and that is worth knowing before anyone argues about a label.

  • Predictive is a type of condition-based maintenance. Moleda et al. write that "predictive maintenance is a type of condition-based maintenance in which we predict future performance based on current and historical indicators" (Section 2.3, p. 7). On this reading, condition-based is the wider family, and predictive adds a forecast.
  • Predictive and condition monitoring are the same thing. The NASA guide uses "Predictive Maintenance: See condition monitoring" in its glossary, and defines condition monitoring as "The continuous or periodic monitoring and diagnosis of systems and equipment in order to forecast failure" (Appendix A, p. A-3, A-6). Its separate entry for condition-based maintenance (CBM) is "Facility and equipment maintenance scheduled only when the condition of the facility or equipment requires it" (Appendix A, p. A-2).
  • It depends on the paper. Olesen and Shaker state the disagreement directly: "The term PdM and CDM has found different use in various papers. Some define it to differ, while others use it interchangeably." They choose to use the terms interchangeably (Section 2.1, p. 4). (CDM is their abbreviation for condition-based maintenance.)

Read together, the useful line is not between "condition-based" and "predictive" but between the monitoring and the work it triggers. NASA's glossary makes this explicit: condition monitoring "is a Time- or Cycle-Based Maintenance Action", and "The data obtained allows for planning and scheduling preventive maintenance or repairs in advance of failure" (p. A-3). The vibration route runs on a schedule; the bearing change it leads to runs on condition. Whether a plant calls that bearing change "condition-based" or "predictive" matters less than using one word for it every time.

How do the four strategies compare side by side?

The table below sets the sources next to each other. "Breakdown" is the word many Indian plants use; NASA lists it as another name for reactive maintenance.

Breakdown / reactive Preventive (time-based) Condition-based Predictive
What triggers the work A functional failure A time, operating-hours or cycle interval, regardless of condition Measured condition shows the work is needed A forecast from current and historical condition data that a fault is coming
Other names in the sources Repair, fix-when-fail, run-to-failure (RTF), corrective, trouble call (NASA 5.1; Moleda 2.1) Time-based, interval-based (NASA glossary); PvM (Olesen) CBM (NASA), CDM (Olesen) PT&I, condition monitoring (NASA); PdM
Example the sources give Non-critical small motors, restroom exhaust fans, small water heaters (NASA 5.1); a spare car bulb kept for when one burns out (Moleda 2.1) Oil changed on an operating-time basis in small reservoirs; car oil changes (NASA 6.6.1.2); lubrication, adjustments, oil changes (Moleda 2.2) Maintenance scheduled only when condition requires it (NASA glossary) Vibration, thermography, oil analysis, ultrasonics, motor current, process parameters (NASA 6.1; Moleda 2.3)
Data it needs A record of what failed and why, so the RTF choice can be checked In-service age-reliability data for the item; NASA says this "is not normally available" A baseline and readings trended against alert and alarm limits Condition history, and for data-driven models a large amount of high-quality data
What the sources say it suits A conscious choice where risk and cost of failure are low (NASA 5.1); non-critical, easily repairable equipment (Moleda 2.1) Items subject to wear-out, consumables, known failure patterns (NASA Figure 3-1); abrasive, erosive or corrosive wear, fatigue, clear age-reliability link (NASA 2.2) Random failures, items not subject to wear, PM-induced failures (NASA Figure 3-1, for PT&I) As condition-based (NASA treats them as one); the logic tree asks first whether an effective PT&I technology exists (NASA Figure 3-2)
Limit the sources state No influence on when failures occur; unplanned work, high spares stock (NASA 5.1) Costly and ineffective as the only strategy; can add infant mortality (NASA 5.2) Not suited to all equipment or failure modes (NASA 5.3) A large share of published models tested only in experimental settings; industrial data noisy, with missing data and no labels (Olesen 4)

The table separates condition-based and predictive because Moleda et al. do. Under NASA's terms, those two columns are one strategy.

What is the difference between preventive and breakdown maintenance?

Preventive work is done on an interval before anything fails; breakdown work is done after a functional failure. NASA lists the names together: "Reactive Maintenance is also referred to as breakdown, repair, fix-when-fail, or run-to-failure (RTF) maintenance." Under it, repair or replacement "occurs only when the deterioration in the condition of the equipment causes a functional failure" (Section 5.1, p. 5-3). Olesen and Shaker describe the reactive approach as one that "allows components and machinery to run till failure", with long downtime as the consequence (Section 1, p. 1). Moleda et al. call it corrective maintenance, "taking action after a failure has occurred" (Section 2.1, p. 6).

The NASA guide is clear that breakdown maintenance is not always wrong. It says "There is no ability to influence when the failures occur because no (or minimal) action is taken to control or prevent them", and that a high share of unplanned work and high spares inventories are typical "when reactive maintenance is the only type of maintenance practiced." But "Reactive maintenance can be used effectively when it is performed as a conscious decision based on the results of an RCM analysis that compares the risk and cost of failure with the cost of the maintenance required to mitigate that risk and cost of failure" (Section 5.1, p. 5-3). The examples it gives are non-critical electric motors under 7.5 HP, comfort cooling, restroom exhaust fans and small, low-temperature water heaters, with a caution: "When deciding what items to relegate to Reactive Maintenance, ensure all functions and consequences are fully understood."

So two breakdown jobs on the same day can mean very different things. One is a restroom fan that the plant chose to run to failure. The other is a feed pump that was supposed to be on a vibration route and failed anyway. Both are "breakdown" on the work order, and only one is a problem with the maintenance plan.

Ink line drawing of a horizontal centrifugal pump and electric motor on a common baseplate, with a small vibration sensor and cable mounted on the motor bearing housing

Where does run-to-failure fit?

In the NASA guide, run-to-failure is one of a small number of outcomes of a decision, not a default. Its glossary defines it as "A Maintenance Approach where no action (Time- or Cycle-Based actions) to prevent failure is taken following installation", and says "Candidate systems or machines for Run-to-Failure are usually low-cost, easily repaired, and non-critical" (Appendix A, p. A-8).

The NASA RCM logic tree (Figure 3-2, p. 3-5) puts the strategies in order. If a failure would affect environment, health, safety, security, energy efficiency or cause other economic loss, the first question is whether there is an effective PT&I technology; if not, whether there is an effective interval-based task; if neither, redesign the system or accept the risk. If the failure has none of those effects, the item is a candidate for run-to-fail. The guide says the analysis "has only four possible outcomes": interval-based actions, condition-based actions, "Perform no action and choose to repair following failure", or redesign or redundancy when no maintenance action will reduce the probability of failure (Section 3.3.1.2, p. 3-6). In the same section, "Run-to-Failure (RTF) is a conscious decision and is acceptable for some equipment" (Section 3.3.1.1, p. 3-6).

That gives a practical test for any breakdown work order: was this item meant to run to failure? If yes, the breakdown is the plan working. If no, it is a missed failure, and it belongs in a different count.

Is a time-based oil change "predictive"?

No. In all three sources an oil change on a fixed interval is preventive maintenance. Moleda et al. list oil changes among typical preventive tasks (Section 2.2, p. 6). The NASA guide says "Small reservoirs, usually one gallon or less, have the oil changed on an operating time basis", and calls the car "the most common example of time-based lubricating oil maintenance" (Section 6.6.1.2, p. 6-13).

What would be predictive, in NASA's terms, is oil analysis. Lubricating oil analysis is performed "to determine the machine mechanical wear condition, the lubricant condition, and whether the lubricant has become contaminated" (Section 6.6.1, p. 6-12). The guide also treats the choice between the two as a cost decision: "discard the machine lubricating oil if it is cheaper than analyzing it" (Section 6.6.1.2, p. 6-13). So both are legitimate. An oil change at the scheduled hours is preventive. An oil change because the sample showed contamination or wear metals is condition-based. The job on the floor is the same; the trigger, and therefore the label, is not.

Is a walk-around "condition-based"?

The walk-around itself is a scheduled inspection, so by NASA's definitions it is a time-based task. What it finds can trigger condition-based work.

NASA includes visual inspection among PT&I methods. PT&I "uses primarily non-intrusive testing techniques, visual inspection, and performance data to assess machinery condition" (Section 5.3, p. 5-7), and Table 6-1 marks visual inspection as applicable to every equipment class listed (p. 6-2). It also describes a simple operator check: "The equipment operator may perform weekly inspections to see and smell the lubricating oil" (Section 6.6.2.1, p. 6-13). At the same time, its PM definition covers "Time- or cycle-based actions performed to prevent failure, monitor condition, or inspect for failure" (Appendix A, p. A-6), and its three task types are "time-directed (PM), condition-directed (PT&I directed), and failure-finding" (Section 3.3.1.1, p. 3-6). A weekly round is time-directed. A seal replaced because the round found a leak is condition-directed.

What makes monitoring useful in the NASA guide is the trend, not the visit. "The goals when monitoring equipment condition are to determine equipment condition and to develop a trend with which to forecast future equipment condition", and "A minimum of three monitoring points are recommended" before failure is expected (Section 5.2.2.2, p. 5-6). A walk-around that records nothing comparable from one week to the next gives no trend.

What data does each strategy need?

Each strategy needs different records, and the sources are direct about which ones are usually missing.

  • Preventive. NASA says none of the ways of setting PM periodicity "is valid unless the in-service age-reliability characteristics of the system or equipment affected by the desired task are known", and "This information is not normally available and must always be collected for new systems and equipment" (Section 5.2.2.1, p. 5-5). Moleda et al. say planning schedules "requires historical data for analyses of maintenance history, usage conditions or a failure history" (Section 2.2, p. 7). MTBF alone is not enough in NASA's view: it "provides only the average age at which failure occurs, not the most likely age" (p. 5-5).
  • Condition-based. A baseline and repeated readings. NASA's alert and alarm values are set as deviations from a baseline or from the statistical mean (Section 6.2, p. 6-1), and it says "A new baseline analysis is necessary following machine repair or oil change out" (Section 6.6.4, p. 6-17).
  • Predictive, with models. Olesen and Shaker say the weakness of data-driven models "is their need for a large amount of high-quality data", and "If the data is faulty, it will be reflected in the model and the accuracy will deteriorate" (Section 2.2, p. 4). They add that "industrial data sets, typically, do not have a labelling metric, hence it requires the developer to dive into expert knowledge or company ERP systems to identify faulty data, which in turn can introduce bias", and that "In many cases, there is not necessarily run-to-failure data available" (Section 4, p. 17). They also note a gap between laboratory and plant: a large share of the studies they reviewed were experimental, and "there still exists a gap between experiments and industrial applications" (Section 4, p. 17).
  • Breakdown. NASA's reactive priority table (Table 5-2, p. 5-4) ranks repairs by the consequence of failure. To check later whether a run-to-failure choice was right, the plant needs to know which failures were planned RTF and what each one cost.

Every one of these needs the same thing underneath: maintenance records where the trigger and the finding are written down the same way each time. For more on what vibration data can and cannot show on rolling-element bearings, see what a 2021 review concluded about bearing vibration methods.

Ink line drawing of a plant floor with a gearbox, a pump set and an electrical cabinet, each fitted with a different small monitoring device: a vibration sensor, an oil sample valve with a bottle, and an infrared camera on a tripod

How should work orders be labelled so the numbers can be compared?

Label each work order by what triggered it, and keep the monitoring task separate from the work it leads to. That is our suggestion, built on the NASA task types above; none of the three sources gives a work-order coding scheme.

The NASA guide shows why labels matter. Its Pareto analysis tracks the "maintenance burden" by "identifying where, when, and how (i.e., RM, PM or PT&I) the maintenance occurs", and notes that "With labeled maintenance man-hour expenditures, both the high burden items and the distribution of the burden within the facility can be tracked over time" (Section 9.1.1, p. 9-1). Its sample KPIs include the ratio of PM and PT&I man-hours to reactive man-hours (Table 12-1, p. 12-3). A ratio like that only means something if the oil change and the walk-around from the opening example are counted in the right column.

What the job was What triggered it Label (NASA term)
Oil changed at the scheduled hours Interval Preventive, time-directed
Oil changed after a sample showed contamination Measured condition Condition-directed (PT&I)
Weekly walk-around or vibration route Interval Preventive, time-directed (monitoring task)
Seal replaced after the walk-around found a leak Finding on the round Condition-directed (PT&I)
Test of a standby pump or alarm that is not normally running Interval, to find a hidden failure Failure-finding
Restroom fan replaced after it stopped Failure, planned run-to-failure Reactive, RTF by decision
Feed pump repaired after it tripped Failure, not planned Reactive, unplanned

A few fields on the work order make this work:

  1. Trigger: interval, condition finding, failure, or failure-finding test.
  2. For condition work: which reading or observation triggered it, and from which route.
  3. For failures: whether the item was meant to run to failure.
  4. What was found: the as-found condition. NASA uses failed-part analysis to refine alert and alarm values by "correlating the as-found condition to the PT&I data" (Section 6.2.1.3, p. 6-2).

The same record then serves three purposes: the strategy split is countable, interval decisions can be checked against what was actually found, and any later model has labelled history to learn from, which is the gap Olesen and Shaker describe. We covered why the same fault written five ways never adds up in same machine, five descriptions, and the fixed fields for a breakdown register you can still search.

Which one should a plant use?

All of them, item by item. None of the three sources recommends one strategy for everything.

NASA's RCM approach "integrates Preventive Maintenance (PM), Predictive Testing and Inspection (PT&I), Repair (also called reactive maintenance), and Proactive Maintenance" (Section 3.1, p. 3-1), and says "The actual mix and usage of the various types of maintenance tasks should be driven by the end users based on their risk tolerance and budget" (Section 5.0, p. 5-1). It warns against each strategy alone: PM "can be costly and ineffective when it is the sole type of maintenance practiced" (p. 5-5), PT&I "should not be the sole type" (p. 5-8), and reactive maintenance as the only type brings unplanned work and high spares (p. 5-3). It also says "Condition-based Maintenance should not replace all interval-based maintenance" (Section 2.2, p. 2-3).

Moleda et al. report that in the energy sector "Corrective and preventive strategies are still the main approaches", and that the profits from smart manufacturing appear only if the approach limits "traditional preventive actions, which, however, is related to taking a certain risk" (Sections 6.1 and 6.2, pp. 33-34). For the history behind the shift away from fixed overhaul intervals, see what the original RCM study actually said. For a full read of the Moleda review itself, see what a 2023 power-industry review actually covers.

None of the sources gives a "right" percentage split between strategies for a plant, and we don't either. The NASA KPI table gives sample benchmarks from a corporate survey (Table 12-1); those are survey averages, not a target derived for any particular plant.

What these sources don't tell you

  • No single agreed vocabulary. The three sources do not use the same terms for condition-based and predictive maintenance. The table above maps them; it does not settle the question. National and international standards (for example EN 13306, which Moleda et al. cite for the definition of maintenance) were not read for this post.
  • The NASA guide is for facilities. It was written for NASA facilities and collateral equipment, and its examples (HVAC, restroom fans, chilled water) reflect that. The NASA guide's own figures from cited studies, such as the airline failure-pattern data, are not repeated here as findings for other industries.
  • Both reviews are power-sector. Moleda et al. focus on power generation; Olesen and Shaker on pump systems and thermal power plants. Their definitions are general, but their examples are not.
  • No consultant figures. Moleda et al. cite consultant reports on predictive-maintenance savings in their introduction. Those are not the paper's own measurements and are not used here.
  • The work-order labels are ours. The labelling table and fields are our suggestion built on NASA's task types. They are not taken from any of the sources.

Where does HangerSearch fit?

Every strategy above depends on what was written down after the job: the reading that triggered the work, the as-found condition, whether a failure was planned. Much of that sits in finalized service and inspection reports kept as PDFs. HangerSearch searches those finalized reports where they already sit and cites the page each answer comes from, so past findings on an asset can be found when a task interval or a run-to-failure decision is reviewed. It does not schedule maintenance, label work orders or predict failures. See how we handle your reports.

Book a 20-minute demo: hangersearch.com

FAQ

What is the difference between predictive and preventive maintenance? Preventive maintenance is done on a fixed interval of time, operating hours or cycles, regardless of equipment condition. Predictive maintenance is done when measured condition shows it is needed, usually shortly before a fault is expected. The NASA RCM guide says predictive maintenance replaces arbitrarily timed tasks with maintenance scheduled only when equipment condition warrants it.

What is condition-based vs predictive maintenance? It depends on the source. Moleda et al. (2023) call predictive maintenance a type of condition-based maintenance that predicts future performance from current and historical indicators. The NASA RCM guide treats predictive maintenance and condition monitoring as the same thing. Olesen and Shaker (2020) note that some papers treat the two as different and others use them interchangeably.

What is the difference between preventive and breakdown maintenance? Preventive maintenance is scheduled before failure. Breakdown maintenance, which NASA also calls reactive, repair, fix-when-fail or run-to-failure, happens only after a functional failure. NASA says breakdown maintenance can be used effectively when it is a conscious decision based on comparing the risk and cost of failure with the cost of preventing it.

Is a scheduled oil change predictive maintenance? No. An oil change on a fixed time or hours interval is preventive maintenance in all three sources. Oil analysis is a predictive (condition monitoring) technique, and an oil change triggered by an analysis result is condition-based work.

When is run-to-failure acceptable? The NASA guide says run-to-failure is a conscious decision acceptable for some equipment, usually low-cost, easily repaired and non-critical items, where the failure has no direct adverse effect on safety, environment, security, energy efficiency or other economic loss.

Sources

  1. NASA, Reliability-Centered Maintenance Guide for Facilities and Collateral Equipment, National Aeronautics and Space Administration, September 2008 (Final): https://www.nasa.gov/wp-content/uploads/2023/02/nasa_rcmguide.pdf. PDF downloaded on 27 Nov 2026 (451 pages including appendices); text extracted with pdftotext. Read: Chapters 2 and 3, Section 4.1, Chapter 5, Sections 6.1, 6.2 and 6.6, Section 9.1, Sections 12.2 to 12.4 and the Appendix A glossary. Page numbers are the guide's printed chapter-page numbers (for example 5-3). Figures 3-1 and 3-2 were read from the rendered pages.
  2. Moleda, M., Malysiak-Mrozek, B., Ding, W., Sunderam, V. and Mrozek, D. (2023). "From Corrective to Predictive Maintenance - A Review of Maintenance Approaches for the Power Industry." Sensors 23(13): 5970. https://doi.org/10.3390/s23135970. Open access. Sections 2 to 2.3 and 6 used here. Consultant figures cited in its introduction are not used.
  3. Olesen, J.F. and Shaker, H.R. (2020). "Predictive Maintenance for Pump Systems and Thermal Power Plants: State-of-the-Art Review, Trends and Challenges." Sensors 20(8): 2425. https://doi.org/10.3390/s20082425. Open access; authors at the Center for Energy Informatics, University of Southern Denmark, with the first author also at Orsted. Sections 1, 2.1, 2.2, 3.2, 4 and 5 used here.